60 MW.
SOUTH TEXAS
BITCOIN MINING.

Vector Grid Solutions is developing a 60 MW dedicated Bitcoin mining facility on 130 acres in South Texas — with a 138 kV transmission line on property and a direct path to energization in 12 months.

0 MW
Total Capacity
0
Mining Units
0 AC
Site Acreage
0 Mo
Path to Full Power
THE OPPORTUNITY

INSTITUTIONAL SCALE.
PRIVATE MARKET PRICING.

Most Bitcoin mining investments are either small-scale retail or require institutional minimums. Vector Grid Solutions offers a rare middle path: a 60 MW facility with partner-priced hardware, a confirmed utility relationship, and a clear 18-month path to full operation.

$0.0544/kWhEffective power rate (incl. TX sales tax)
$7,245Partner pricing per mining unit
20% DownFinanced structure — balance via revenue split
100% Load Factor24/7/365 flat constant draw
3-YEAR RETURN SCENARIOS
BULL CASE
269.3% ROI  ·  +30% profitability/yr
3.69×
BASE CASE
151.2% ROI  ·  Flat profitability
2.51×
BEAR CASE
118.2% ROI  ·  −10% profitability/yr
2.18×

Return multiples calculated on invested equity (20% down payment basis). 3-year cumulative net profit at 60 MW: Bear $82.6M | Base $91.5M | Bull $121.6M.

ENERGIZATION RAMP — 10 MW/MONTH
MONTHCAPACITY
MONTH 110 MW
MONTH 220 MW
MONTH 330 MW
MONTH 440 MW
MONTH 550 MW
MONTH 660 MW
PRIMARY SITE

SOUTH TEXAS

High voltage 138 kV transmission line corridor across flat Texas plains
Aerial view of cleared South Texas acreage ready for developmentTexas electric utility poles and transmission infrastructure
Total Acreage~130 Acres
Transmission138 kV Line On-Property
Distance to Sub~2.2 Miles
Substation Land8–10 Acres Allotted
Voltage Strategy138 kV → 34.5 kV Step-Down
CONFIDENTIAL INQUIRY

REQUEST NDA & INVESTMENT DECK

All investment materials are distributed under a mutual NDA. Complete the form below and we will send you the full 60 MW investment deck and NDA within 24 hours.

By submitting, you agree to receive investment materials under mutual NDA. This is not a public offering.